This post show you guide on how to remove fusible links for Hitachi excavator.
Hitachi MPDr v2.56 v2.25 Diagnostic Software Free Download
2016 HITACHI Parts Manager Pro 6.5.5 Free Download
2019 Hitachi Workshop Service Manual PDF Download
1. Visually check if fusible links (1, 2, 3) are blown.
Replacement
IMPORTANT
Turn the key switch to the OFF position, wait 5 minutes or longer, and then turn battery disconnect switch (7) to
the OFF position.
1. Set battery disconnect switch (7) to OFF position (c)
2. Open covers (4, 5).
3. Remove screws, washers (6) (4 used). Pull out and replace fusible links (2, 3).
4. Install screws, washers (6) (4 used).
5. Pull out and replace fusible link (1).
6. Set battery disconnect switch (7) to ON position (a).
No comments:
Post a Comment