This instruction show you guide on how to remove GSM for Hitachi ZX890-7 excavator.
Procedures:
1. Set the machine position for inspection and maintenance. (Refer to Preparation before Inspection and Maintenance in the separate Workshop Manual.)
2. IMPORTANT
Set the key switch to the OFF position. Wait 5 minute or longer, and then set battery disconnect switch to the OFF position.Set the battery disconnect switch to the OFF position
3. Open door (1).
Hitachi Excavator Trouble Repair,How to Guide,Hitachi troubleshooting,service manual
Thursday, 30 June 2022
How to Remove GSM for Hitachi ZX890-7 Excavator
Saturday, 11 June 2022
Hitachi ZX890-7 Excavator Monitor Controller Installation Guide
Here is a instruction show you guide on how to install monitor controller for Hitachi ZX890-7 excavator.
2021 Hitachi MPDr 3.15.0.0 MaintenancePRO Download
Hitachi Workshop Service Manual 2019 PDF DownloadInstallation of Monitor Controller
1. Install monitor controller (20) to cab (23) with bolts, washers (21) (4 used).
2. Connect connectors (22) (4 used).
Tuesday, 7 June 2022
Hitachi ZX890-7 Excavator Monitor Controller Removal Guide
This instruction show you guide on how to remove monitor controller for Hitachi ZX890-7 excavator.
2021 Hitachi MPDr 3.15.0.0 MaintenancePRO Download
Hitachi Workshop Service Manual 2019 PDF DownloadRemoval of Monitor Controller
1. Set the machine position for inspection and maintenance. (Refer to Preparation before Inspection and Maintenance in
the separate Workshop Manual.)
2. IMPORTANT
Set the key switch to the OFF position. Wait 5 minute or longer, and then set battery disconnect switch to the OFF position.
Set the battery disconnect switch to the OFF position.
3. Open door (1).
Friday, 3 June 2022
Hitachi ZX890-7 Excavator Main Controller Removal and Installation Guide
This instruction show you guide on how to remove and install main controller for Hitachi ZX890-7 excavator.
Preparations:
2021 Hitachi MPDr 3.15.0.0 MaintenancePRO Download
Hitachi Workshop Service Manual 2019 PDF Download
Procedures:
Removal of MC (Main Controller)
1. Set the machine position for inspection and maintenance. (Refer to Preparation before Inspection and Maintenance in
the separate Workshop Manual.)
2. IMPORTANT
Set the key switch to the OFF position. Wait 5 minute or longer, and then set battery disconnect switch to the
OFF position.
Set the battery disconnect switch to the OFF position.
3. Open door (1).
Hitachi Excavator Attachment Setting Constant Change
Hitachi excavator Machine Setting and Monitor Setting are not displayed in initialization. When displaying Machine Setting and Monitor Setti...

-
Hitachi excavator Machine Setting and Monitor Setting are not displayed in initialization. When displaying Machine Setting and Monitor Setti...
-
This instruction show you guide on how to display service menu for Hitachi ZX890-7 excavator. 2021 Hitachi MPDr 3.15.0.0 MaintenancePRO Down...
-
Hitachi Excavator Instruction for Disconnecting Connectors.